The problem to pay attention to when signing a contract is the vehicle condition. In this signed contract, the ore drawing of the vehicle you want to rent should be described in the contract in detail, such as the specific situation of the track. If the track has obvious damage before renting the car, the damaged situation should be explained in the contract, otherwise, the car will be rented at that time It's over. It's likely to be even. In addition to the detailed description of the vehicle in the contract
。 Jiangmen aerial vehicle rental contract should clearly state the specific settlement method, such as annual settlement or monthly settlement, and the payment method should also be detailed in the contract. The bearing of maintenance costs should also be clearly written. For example, maintenance is required after a fault occurs. Which party is responsible for the cost of maintenance? These should be clearly presented in the contract. During the shutdown period, especially during the maintenance period, which party should bear the loss? It should be written clearly in the contract. What's more, how many points does this contract have in total? Who will hold these contracts should be made clear in the contracts. After the contract is signed, both parties should not only sign, but also seal, so that the contract can come into effect.
Source: Jiangmen aerial vehicle rental http://www.ic-hk.net
04-23
Common faults and repair methods of hoisting equipment rental in Guangdong
Guangdong lifting equipment in the operation, it is inevitable to encounter crane failure and affect the use of the situation, then the fault maintenance has become a necessary means of disposal. There are three kinds of common faults of Guangdong hoisting equipment rental crane, and the correspondi
04-23
What are the advantages of aerial vehicle in aerial vehicle operation
Specific configuration of aerial work vehicle: Hydraulic 360 ° full rotation, three folding arms, single hydraulic lifting cylinder, with bidirectional balance valve. Electrically operated boom. With 1 ton retractable hook, four hydraulic cylinders, adjustable legs, with two-way hydraulic lock (out
04-13
Analysis of the reason why the electric hoist of Guangdong hoisting equipment can not operate
Guangdong lifting equipment electric hoist can not run the reason analysis 1, can first check the equipment power fuse is burned, if one phase, so its electric hoist can not rotate, the starting torque of the crane electric hoist is zero, so the motor of the equipment will not run, it is necessary to replace enough fuse. 2. What's more, the voltage of the power grid is too low, so the dynamic torque of the equipment is proportional to the square of the voltage. The acceleration torque can not ov
04-13
Jiangmen high altitude equipment rental tells you the harm of overload operation
The excessive stress caused by overload operation of Jiangmen high-altitude equipment can break the wire rope, damage the transmission parts and burn the motor. Due to the insufficient braking force, the brake can not hold the brake, which will cause serious accidents. Overload operation has great damage to the crane structure, such as the main beam deflection, cracks and desoldering on the upper cover plate and web plate, which brings serious accident risks to the high-altitude equipment operat